Skip to content
Safety · · 2 min read

What an EICR actually tells you

The codes on an electrical condition report look alarming. Here is what C1, C2 and C3 really mean — and which ones you have to act on today.

An Electrical Installation Condition Report — an EICR — is a survey of the fixed wiring in a property. Landlords in England need a satisfactory one every five years, and anyone buying an older house should ask to see one. The report itself can read like a telling-off, so here is how to read it calmly.

The three codes

Every observation carries a code, and only two of the three mean the report is unsatisfactory.

C1

Danger present

Someone could get a shock or the installation could start a fire, now. A C1 is why a report fails, and a decent electrician will make it safe before they leave — even if that means isolating a circuit.

C2

Potentially dangerous

Not live danger today, but it will be under the wrong conditions — no earth on a circuit, say. A C2 also fails the report and needs doing, but it can be booked in rather than fixed on the spot.

C3

Improvement recommended. The installation is safe; it just is not to the latest standard. A C3 does not fail the report, and you are not obliged to act on it. A report that is all C3s is a pass.

Why two electricians can disagree

Coding is a judgement, and an honest one varies at the margins. What should not vary is a C1 — danger present is danger present. If one report is wall-to-wall C2s and the next on the same house finds none, ask both to point at the circuit and show you the reading. Numbers settle it; opinions do not.

Before you book

Worth having ready

  • The age of the property and roughly when it was last rewired
  • Access to the consumer unit and the meter
  • Somewhere to park within a cable’s reach of the board
  • A list of anything that has tripped or buzzed recently

What we do with a fail

If we find a C1 or C2, the report tells you exactly which circuit and why, with a photograph. You get a fixed price to put it right, and once it is done the report is re-issued as satisfactory. No drama, no upsell — just the fault, the fix and the paperwork.

Next step

Need an EICR in Leicester?

We turn reports around in two working days and explain every code in plain English.

See testing & inspection